The QSS Group Limited

Case StudiesCase Studies

Pages: [1] | 2

Class 180 Condition Assessment
Train Operating Companies are handing back the fleet of Class 180 units to the owning ROSCO and as part of the handback process the ROSCO requested an ...
 
Class 180 Project Management
A request from a Train Operating Company to support them in the contract with a maintenance organisation in the incident damage repair to Class 180 unit ...
 
Competency Assessment
Our client, a Rail Infrastructure Maintenance company had experienced some difficulty in managing the range of competencies required to work on rail infrastructure ...
 
Database Development
Our client, a management consultancy organisation, wanted to introduce an IT based company database to replace their existing paper based system. The ...
 
Fleet Maintenance Risk Assessment
Our client, a major UK train operator, wanted to undertake a review of its risk assessments for traction and rolling stock (T&RS) maintenance and repair ...
 
Getting Systems Connected
If you glance up at the passenger information displayers at a railway station, spare a thought for the people who keep these displays working. Chances ...
 
Infrastructure Risk Review
Our client, a major metropolitan transport organisation, wanted to take-over and manage the infrastructure over which their services ran. They identified ...
 
Innovation for Validation
Safety Validation has always been an essential part of safety management. Often this process has been done by Safety Professionals and HR people behind ...
 
Inspection and Monitoring
Our client, a major Infrastructure Controller, requires an independent Safety Inspection and Monitoring service of its main contractors and sub-contractors ...
 
Overhaul Process Review
Our client, a major manufacturer, overhauler and parts supplier to train operators, was experiencing a number of severe fires on their rolling stock. ...
 

Pages: [1] | 2

© 2008 The QSS Group Limited. Terms of Use
Tel: +44 (0)1332 221400 Email: enquiries@theqssgroup.co.uk